BOOSTING PERFORMANCE
A reliable water supply is essential in student accommodation, where demand fluctuates throughout the day. At this particular site within the Nottingham area, the existing cold water booster pump had failed, causing inconsistent water pressure, particularly on upper floors. To restore full functionality, our team was engaged to carry out the removal of the old unit and commission a modern, high-efficiency replacement.
Working within a live residential environment, careful planning was required to minimise disruption. The old pump was safely decommissioned and removed, ensuring all pipework and electrical connections were properly handled. The new booster pump was then installed, offering improved performance and efficiency while supporting the long-term reliability of the building’s water supply.
Once in place, the system was fully commissioned, with flow rates, pressure levels, and overall performance thoroughly tested. The installation was completed smoothly, restoring stable water pressure throughout the property and providing an improved experience for residents.
With a more efficient and durable system now in place, the accommodation benefits from greater reliability and reduced maintenance requirements. This project reflects our commitment to delivering high-quality, reactive maintenance solutions that ensure essential services remain fully operational.